Port: | QINGDAO |
---|---|
Supply Ability: | 2000 Ton/Tons per Month 25-45 days after deposit received for metal Welding Parts Steel |
Payment Terms: | L/C,T/T |
Packaging Details: | High Strength Steel Structure Bridge:are standard package, load in bulk or 20GP,40GP,40HQ,40OT |
Delivery Details: | Shipped in 30 days after payment |
High Strength Steel Structure Bridge